Tracking project progress means comparing what the plan said would be done with what is actually done, and acting on the difference. A status you can trust does four things:

The plan as it was approved, not as it is today.
Not started, in progress, done or blocked.
A due date and the date of the last update.
What moved, what is stuck, what happens next.
Keep progress in Evernote. Turn the plan into a status table, draw the timeline, and assign tasks.
Keep the approved plan as the baseline. ProjectManager says the baseline lets you compare the plan with actual progress.
Use a small set of states: not started, in progress, done, blocked. Put the status in the table, not in a separate message.
Write the date you changed the row.
Look at the tasks that are late or blocked. Ask what changed and who can unblock it, not only how many tasks are done.
Use the elements Atlassian lists: an executive summary of no more than six sentences, visual progress, the schedule, the budget, blockers and next steps.
Name the blocker, the owner and the date you need it resolved. Atlassian says next steps should assign responsibilities and due dates to specific team members.
Pick a weekly or monthly review that matches the project. Atlassian says the frequency should align with the project timeline and the needs of the people who read the report.
| Task | Owner | Status |
|---|---|---|
| 2Book movers | Sam | Done |
| 2Label desks | Rosa | Done |
| 3Move network | Lee | In progress |
| 4Pack files | Rosa | Blocked |
| 4Move furniture | Sam | Not started |
| 7Go live | Lee | Not started |
Status is updated every Friday. A blocked row gets a next step and a date before the report goes out.
The right cadence depends on how fast the project changes and who needs the update.
| Report | Best for | What it covers |
|---|---|---|
| Daily | Work that changes every day and needs close monitoring. | Each person’s tasks, issues and the previous day’s work. |
| Weekly | Short-term milestones inside a longer plan. | The week’s progress, the next week’s plan, risks and blockers. |
| Monthly | Leadership updates and budget decisions. | Accomplishments, the month’s recap and next month’s plan. |
Report types from Atlassian, "Project Status Report: Tips and Templates for Success".
Copy it, or save it to your Evernote account and fill it in before each review.
Project: [name]
Report date: [date]
Executive summary: [no more than six sentences]
Done this week: [tasks and dates]
In progress: [tasks, owners, expected dates]
Blocked: [task, owner, what is needed, by when]
Next week: [tasks, owners, dates]
Budget: [spent to date and forecast]
4.4
2,100+ reviews on G2
4.4
8,200+ reviews on Capterra
4.4
73,000+ reviews on App Store
248M
Registered users
It is the work of comparing the plan with what has actually happened. Atlassian describes a project status report as a concise, timely update on the project’s progress, with what is on schedule, what is blocked and what happens next.
The plan as it was approved, used as the point of comparison. ProjectManager says the baseline sets your plan so you can compare it to actual progress. Without one, a moving plan can make any result look on time.
The end of one project phase and the beginning of the next. ProjectManager defines it that way, and notes that a milestone helps with tracking and morale.
Match the update to the project. Atlassian says the frequency should align with the project timeline, varying from weekly to monthly depending on the project and the people who need the report.
Atlassian lists an executive summary, visual progress, the overall schedule, budget insights, common challenges and blockers, next steps, and the project metrics. The summary should be no more than six sentences.
Say what changed, what it affects and what you are doing about it. Atlassian says to be transparent about current obstacles and to name next steps with owners and dates, so the report leads to an action.
Atlassian says a status report covers the project’s current state, including progress and other data, while a progress report focuses on completed tasks and milestones against the schedule. Both keep the team and stakeholders informed.
Use one note with a table and a fixed weekly review. Keep the baseline, the current status and the report in the same note, so the update starts from the plan instead of a blank page.
Keep the approved plan, the weekly status and the report in one notebook, so the update starts from the plan instead of a blank page.
Open the plan note and ask the AI Assistant to make a status table with tasks, owners and status. It creates a note you can update each week.
Ask it to add a gantt chart of the plan. The Mermaid chart shows the tasks that still overlap and the dates that moved.
Ask it to turn each task into a task assigned to its owner. The owners update their own rows, and the note shows what is done.
Start from the baseline, mark what changed, and send one short update that names the blockers and the next steps.
Start for free