4.4
2,100+ reviews on G2
Painting a room means preparing the space and walls, then painting from the top down: ceiling first, then trim, then walls, with two coats on the walls. It comes down to four things:

A gallon covers about 350 to 400 sq ft per coat.
Clean, patch and sand the walls; cover floors and furniture.
Ceiling, then trim and baseboards, then walls.
Let the first coat dry fully, as the label says, before the second.
Plan the project in Evernote. The AI Assistant works out the paint. Search finds the color code in a photo.
Measure the walls: add the lengths of all walls and multiply by the height, then subtract doors and windows. Choose the color and finish, and buy enough for two coats.
If your home was built before 1978, it may have lead-based paint. Sanding or scraping it makes dangerous dust; the EPA recommends a lead-safe certified contractor, or lead-safe work practices if you do it yourself.
Move furniture out, or to the middle under a drop cloth. Cover the floor, take down wall decor and remove switch and outlet plates.
Wash the walls from the top down and let them dry. Fill cracks and holes with spackle, sand repairs with 220-grit sandpaper, and wipe off the dust.
Cut in the ceiling edges with a brush, then roll the rest. Paint trim, moldings and baseboards next, and let them dry completely.
Tape the trim. Brush a band along the edges, then roll the wall in sections from the top down, overlapping each row by 3 to 5 inches and keeping a wet edge.
Check the can for the dry time and wait until the first coat is completely dry. Remove the tape right after the final coat.
Door and window sizes are from this example. Measure yours. Coverage from Sherwin-Williams: about 350-400 sq ft per gallon.
Finishes go from flat (no shine) to gloss (high shine). Flatter finishes hide wall flaws better; shinier ones are easier to wipe clean.
| Finish | Look | Good for |
|---|---|---|
| Flat | No shine | Ceilings, walls in low-traffic spaces |
| Matte | Very little shine | Walls in living rooms, dining rooms, bedrooms |
| Eggshell | Low sheen | High-traffic walls, living rooms, bedrooms |
| Pearl or satin | Soft sheen | High-traffic walls, trim, doors, cabinets |
| Semi-gloss | Shiny | Trim, doors, cabinets, wainscoting |
| Gloss | Very shiny | Trim, doors, cabinets, architectural details |
Source: Benjamin Moore, "How to Choose a Paint Finish" (common interior sheen uses).
Copy it, or save it to your Evernote account and fill it in before you go to the store.
Room: [length] x [width] ft, ceiling [height] ft
Wall area: [perimeter] x [height] minus doors and windows = [sq ft]
Paint: [sq ft] x 2 coats ÷ 400 = [gallons], rounded up. Color: [name and code]. Finish: [finish]
Supplies: brush, roller, tray, tape, drop cloth, spackle, sandpaper
Home built before 1978: [yes / no]. If yes, check for lead first.
Order: ceiling, trim, walls. Second coat after [dry time]
4.4
2,100+ reviews on G2
4.4
8,200+ reviews on Capterra
4.4
73,000+ reviews on App Store
248M
Registered users
Work out the wall area: the total length of the walls times the height, minus doors and windows. A gallon covers about 350 to 400 square feet per coat, so a 12 x 14 ft room with 8 ft walls needs about 2 gallons for two coats.
Prep first, then paint the ceiling, then the trim, moldings and baseboards, and the walls last. Let each part dry before the next.
You may not need to prime walls that were painted before. Prime unfinished drywall and trim that was never painted.
Check the can or the product's technical data sheet for the dry time, and wait until the first coat is completely dry.
Paint makers like Benjamin Moore recommend at least two coats of the top coat for full hide and even color.
Remove it immediately after the final coat, as Benjamin Moore advises.
Not if it might contain lead. Homes built before 1978 may have lead-based paint, and sanding creates lead dust. The EPA recommends a lead-safe certified contractor, or strict lead-safe practices for DIY work.
Keep one note for the room: measurements, supplies and a photo of the paint label.
Write the room's measurements in a note. Ask the AI Assistant how much paint you need for two coats, and to add a supply checklist to the note.
Take a photo of the paint can label and keep it in the project note. When you need to touch up the paint, search for "color" and Evernote finds the words in the photo and highlights them.
Ask the Assistant to remind you, for example to do the second coat in 4 hours. It adds a task with a due time.
Measurements, supplies, the photo of the paint label and a reminder for the next step, all in one note.
Start for free